8th Annual Bridge Seminar Day
February 5, 2019
8:00 am to 5:00 pm
Location:
Marriott Griffin Gate
1800 Newtown Pike
Lexington, KY 40511
Agenda:
KYTC Geotechnical Branch – Michael Carpenter (KYTC)
Bridge Preservation: Practices for Long Lasting Concrete Repairs – Chris Ball (Vector Corrosion Technologies)
I-69 Ohio River Crossing Update – Marshall Carrier (KYTC)
KYTC Division of Construction Update – Mark Walls (KYTC DOC)
Economy & Life Cycle Costs of Steel & Concrete Bridges – Dr. Michael Barker (University of Wyoming)
Bridging Kentucky Program Update and Roundtable
Deep Water Drilled Shafts for the Herrington Lake Bridge – Darrin Beckett (KYTC Geotechnical Branch)
Kennedy Mill Bridge over Herrington Lake Construction - Corey Thomas & Matt Simpson (KYTC)
KYTC Bridge Maintenance Branch - Erin Van Zee (KYTC)
Bridging Kentucky Screening Process – Mike Lawler (Stantec)
KYTC Division of Structural Design - Carl Van Zee (KYTC)
Bridge Contractor | Designer | Construction Roundtable
CPD/PDHs = 8
Fees: KSPE/ACEC-KY/SAME/KYTC - $150.00
Non-Member - $250.00
|