Print Page   |   Contact Us   |   Sign In   |   Register
2018 Bridge Seminar Day
Share |

2018 Bridge Day Seminar Presentations
January 31, 2018 | Marriott Griffin Gate

KYTC Geotechnical Branch - Bart Asher (KYTC) and Darrin Beckett (KYTC)

Pedestrian Bridges - Design Codes and Live Loads - Roger Wade (Qk4)

KYTC Bridge Maintenance Branch Update - Erin Van Zee (KYTC)

Load Rating of Bridge Size Culverts - Issam Harik (KTC)

KYTC Division of Construction Update - Mark Walls (KYTC DOC)

Bridge Information Modeling - Marvin Wolfe (KYTC DOSD) and Jason Stith (Michael Baker)

Lunch: 2018 Six-Year Highway Plan Development – Representative Sal Santoro 

MLK Connector Project - Jon Derner, Horner & Shifrin

Lake Barkley Bridge: Construction Methods and Lessons Learned - Austin Hart (KYTC D-1 Construction)

KYTC Division of Structural Design - Bart Asher (KYTC) and Joe Van Zee (KYTC)

Olmsted Park Historic Bridge Rehabilitations - Craig Klusman (AECOM) and Kevin Bailey (KYTC D-5)

Bridge Contractor | Designer | Construction Roundtable - Panelists: Kevin Wolfe (Haydon Bridge), Amos Hubbard (Hinkle), Chris Proffitt (Scott and Murphy), Ed O’Dell (DLZ), Pete Szak (GRW), Joe Van Zee (KYTC), Mark Wall (KYTC)


Note: If there is not a link for the presentation, we have not received the okay to post yet from that speaker. 

Membership Management Software Powered by YourMembership  ::  Legal